November 18, 2025
·
Item number:Item #2026-876
$
Total cost:
$400K
The city is moving $400,214 from one storm-drain project to pay for emergency drainage repairs as they arise. This keeps the total spending the same but speeds up response to flooding or drainage problems.
November 18, 2025
·
Item number:Item #2026-877
$
Total cost:
$2.5M
City redirects $2.5M in stormwater tax revenue to repair and improve drainage infrastructure across Mobile. Work addresses flooding, backups, and water quality in neighborhoods most affected by heavy rainfall.
November 18, 2025
·
Item number:Item #2026-903
$
Total cost:
undisclosed
Courtyard Mobile at 1000 W. I-65 Service Road S. is cleared to sell beer and wine for off-premises consumption. Neighbors can review details before the ABC Board votes.
🌳
Land area:
1 parcel
November 18, 2025
·
Item number:Item #2026-904
$
Total cost:
$30K
Storm drains from North Hamilton to Conception Street will be cleared of vegetation and debris, reducing flood risk in that area.
November 18, 2025
·
Item number:Item #2026-909
$
Total cost:
$475K
Mobile shifts capital funds from ADEM testing to boost stormwater runoff and flood prevention across the MS4 (municipal separate storm sewer) system.
November 12, 2025
·
Item number:Item #2026-827
$
Total cost:
undisclosed
Rich Heidal seeks permission to exceed noise limits on S. Monterey Street (between Dauphin and McGill) for a May 9 evening event. Neighbors in the area may experience higher sound levels during the 4-hour window.
November 12, 2025
·
Item number:Item #2026-845
$
Total cost:
undisclosed
Matthew LeMond can hold a late-night event at 518 Dauphin Street without violating city noise rules. Neighbors in the area may experience increased sound during the 5-hour window.
November 12, 2025
·
Item number:Item #2026-829
$
Total cost:
undisclosed
Angela Jones gets permission to operate at a higher noise level from 7:30–11:30 a.m. on June 6 at 645 Shelby Street in District 2, suspending normal noise ordinance limits for that date and time window.
November 12, 2025
·
Item number:Item #2026-830
$
Total cost:
undisclosed
Reece Pagel can hold an event from 6–9:30 p.m. at 1673 Government Street without noise-ordinance penalties. Neighbors in the area may experience louder activity during that window.
November 12, 2025
·
Item number:Item #2026-825
$
Total cost:
undisclosed
3680 Dauphin Street in District 5 gets permission to operate between 1:00 a.m. and 6:00 a.m. on three nights despite the Noise Ordinance. Neighbors may experience extended early-morning activity.
November 12, 2025
·
Item number:Item #2026-860
$
Total cost:
undisclosed
Expands what Cottage Hill Package (6376 Cottage Hill Road) can sell — adds a new Lounge Retail Liquor Class II license type. Corrects an earlier council vote to align with the ABC Board application.
November 12, 2025
·
Item number:Item #2026-797
$
Total cost:
$22K
Mobile pays Butler Complete Services to clear vegetation and debris from storm drains along Arrington Drive to Warrenton Court, reducing flood risk in the area.
November 12, 2025
·
Item number:Item #2026-796
$
Total cost:
$22K
Work clears vegetation and debris from storm drains on Prichard Ave. to Reynolds Ave., improving drainage and reducing flood risk in the area.
November 12, 2025
·
Item number:Item #2026-849
$
Total cost:
$25K
Vegetation and debris removal along Vista Ridge Drive will clear storm drainage; improves stormwater management and reduces local flooding risk.
November 12, 2025
·
Item number:Item #2026-857
$
Total cost:
$28K
Clears vegetation and debris from storm drains between Outley Drive and Candia Court to improve drainage and reduce flood risk in the area.
November 12, 2025
·
Item number:Item #2026-847
$
Total cost:
$22K
City contracts with Southern Realty Management Group to clear vegetation and debris from storm drainage at this location, improving water flow and reducing flood risk.
November 12, 2025
·
Item number:Item #2026-800
$
Total cost:
$400K
City is shifting $400,214 from a planned storm drain and pipe project to pay for emergency on-call drainage repairs. Affects how fast the city can respond to flooding and water damage issues.
November 12, 2025
·
Item number:Item #2026-858
$
Total cost:
$2.5M
Mobile is shifting $2.5 million from its storm water fund to repair and upgrade drainage infrastructure. Better storm water management reduces flooding risk and keeps streets passable during heavy rain.
November 4, 2025
·
Item number:Item #39
$
Total cost:
undisclosed
City water system maintenance continues under competitive contract. Ensures reliable chemical treatment for safe drinking water delivery.
November 4, 2025
·
Item number:Item #2026-795
$
Total cost:
undisclosed
Brandon Oates gets permission to hold a late event (5–11 p.m.) at 1757 Government Street in District 2 without noise-ordinance penalties. Nearby residents may experience elevated sound levels that evening.