February 3, 2026
·
Item number:Item #2026-1646
$
Total cost:
undisclosed
Maura Mandyck receives permission to exceed noise limits at this downtown location for a 1.5-hour event on September 12. Neighbors in District 2 may experience higher sound levels during the approved window.
February 3, 2026
·
Item number:Item #2026-1649
$
Total cost:
undisclosed
Johna Brown gets permission to exceed noise limits at this District 3 address from 3–10 p.m. on September 5, 2026—likely for an event or gathering.
February 3, 2026
·
Item number:Item #2026-1666
$
Total cost:
undisclosed
Mobile grants a retail liquor license for package sales at 510 S. Broad Street, allowing 510 Package Store, Inc. to sell packaged alcohol beverages at this location.
February 3, 2026
·
Item number:Item #2026-1654
$
Total cost:
$29K
Storm drainage vegetation and debris removal along Government Boulevard improves water flow and reduces flooding risk in the area.
February 3, 2026
·
Item number:Item #2026-1656
$
Total cost:
$24K
Scott Alan Construction will clear vegetation and debris from storm drains along Orangeburg Drive, reducing flood risk for nearby homes and businesses.
February 3, 2026
·
Item number:Item #2026-1618
$
Total cost:
undisclosed
The city will access competitive bids for construction and maintenance supplies—pavement, sidewalk materials, and park equipment—through a shared purchasing deal with the county, potentially lowering costs for taxpayers.
February 3, 2026
·
Item number:Item #2026-1663
$
Total cost:
$18K
City approves replacement pump for the Museum's chiller system through sole-source procurement. Routine maintenance purchase.
February 3, 2026
·
Item number:Item #2026-1645
$
Total cost:
undisclosed
Jason Craig gets a one-day noise exemption at 1644 Virginia Street (District 2) on September 5, 1 p.m.–9 p.m. Neighbors may experience louder activity than ordinance allows.
February 3, 2026
·
Item number:Item #2026-1672
$
Total cost:
$43K
Municipal Garage on Gayle Street gets new fencing and gates. Funds come from general budget.
February 3, 2026
·
Item number:Item #2026-1670
$
Total cost:
$29K
City purchases specialized equipment to improve stormwater management and maintenance operations.
February 3, 2026
·
Item number:Item #2026-1615
$
Total cost:
undisclosed
Alabama Power will move power lines within city right-of-way to allow traffic improvements at the Halls Mill and Demetropolis Roads intersection. The project clears the way for construction to improve the intersection.
February 3, 2026
·
Item number:Item #2026-1648
$
Total cost:
undisclosed
Jason Craig gets permission to hold an event at 1644 Virginia Street on October 3 from 1–9 p.m. without standard noise restrictions in District 2.
February 3, 2026
·
Item number:Item #2026-1655
$
Total cost:
$22K
Storm drains along Via Immaculata to Bartran Curve will be cleared of vegetation and debris, improving water drainage during heavy rain. No-bid contract.
January 27, 2026
·
Item number:Item #2026-1553
$
Total cost:
undisclosed
Intersection improvements at Halls Mill and Demetropolis Roads require Alabama Power Company to move utility lines from the city right-of-way. This clears the way for construction work to proceed.
January 27, 2026
·
Item number:Item #2026-1579
$
Total cost:
$21K
Vegetation and debris removal from storm drains in the Spring Grove East to Summer Crossings area will reduce flooding risk and improve stormwater flow for nearby residents.
January 27, 2026
·
Item number:Item #2026-1593
$
Total cost:
$20K
Contract amendment adds $20,000 to Volkert, Inc.'s Broad Street Phase III project (Garrity St. to Palmetto St.), likely extending or enhancing the street improvement scope for this corridor.
January 27, 2026
·
Item number:Item #2026-1598
$
Total cost:
undisclosed
City joins Mobile County's competitive bid pool for construction and maintenance materials, potentially lowering costs for roadway, sidewalk, and park projects through shared procurement leverage.
January 27, 2026
·
Item number:Item #2026-1578
$
Total cost:
$26K
Maintenance work removes vegetation and debris from storm drainage at Medal of Honor Park, keeping the system clear and reducing flooding risk in the surrounding area.
January 20, 2026
·
Item number:Item #2026-1547
$
Total cost:
$20K
Contractor will remove vegetation and debris blocking storm drains on this stretch of road, reducing flood risk for nearby properties.
January 20, 2026
·
Item number:Item #2026-1542
$
Total cost:
undisclosed
Shameka Webb Casher gets permission to hold a noise-exempt event at 860 Pine Run Road in District 6 from 6:30 p.m. to 10:00 p.m. on August 15, 2026. Neighbors in the area may experience louder activity during those hours.